Classification - Clearance of 2nd lamp with the set of "Solar ...

Central Excise

May 23, 2020

Classification - Clearance of 2nd lamp with the set of "Solar Power Generating System" or "Solar Photovoltaic Lantern" to M/s Aura Solar Products Pvt Ltd - Benefit of Exemption - revenue has no jurisdiction to vivisect the package and classify one lantern separately. The classification of the goods need to be determined in the form and manner in which the same is cleared and not by unbundling/ vivisecting the package into individual components to determine their classification.

View Source

 


 

You may also like:

  1. Rate of GST - product Solar HT/LT XLPE Cables to be used in the manufacture of Solar Power Generating System/ Solar Power Generator - The product in question viz. Solar...

  2. Classification of goods and rates of GST - solar inverter - the combination of solar panel, inverter, solar battery and charge controller may qualify as “Solar Power...

  3. Benefit of Exemption - Manufacture of Tubular Plate Lead Acid Batteries for use in solar photovoltaic modules/ system - The Experts Opinions submitted by the Appellant...

  4. Input tax credit - inputs / capital goods / input services - Solar Power Generating Plant of the applicant qualify as 'plant and machinery' as it falls under machinery -...

  5. Classification - Substation Equipments - part of “Solar Power Generating System” or not - Once the entry includes “Solar Power Project”, all the material equipments used...

  6. Depreciation on leased asset - Solar Generating System – Once, lease rentals are accepted by the revenue, there is no reason to disallow the depreciation - AT

  7. Turnkey EPC Contract are not getting covered under supply of 'Solar Power Generating System' under Entry 234 of Schedule I of the Notification - The contract for...

  8. Disallowance of higher reduction of depreciation on the cost of civil engineering works for laying foundation of solar power panels - the expenditure which is incurred...

  9. Supply of solar inverter, controller, battery and panels would covered under “Solar Power Generating System” as a whole in terms of serial no. 234 of Schedule-I of the...

  10. Classification of goods - PV DC Cables - cables which connect the solar modules & inverters in a photovoltaic system and are used to carry electricity from the SPGS to...

 