Home
Forgot password New User/ Regiser ⇒ Register to get Live Demo
Audit Plan - Goods And Services Tax Audit Manual 2019 [CBIC] - GSTExtract 5.6 Audit Plan 5.6.1 The objective of preparing an audit plan is to outline a logical series of review and examination steps that would meet the goals and standards of an audit in an efficient and effective manner. 5.6.2 Audit Plan is the most important stage before conduct of audit. All the previous steps are actually aimed at preparation of a purposeful Audit Plan. Therefore, it is important that all previous steps are completed and the relevant Working Paper of each of the steps is filled up before commencing preparation of an audit plan. By now, the auditor is in a position to take a reasonable view regarding the vulnerable areas, the weak points in the systems, abnormal trends and unusual occurrences that warrant detailed verification. Certain unanswered or inadequately answered queries about the affairs of the registered person may also be added to this list. 5.6.3 Audit plan should be a detailed plan of action, preferably in a standard format. The audit plan should be consistent with the complexity of the audits ( Annexure GSTAM-VII ). 5.6.4 The summary results of desk review, along with the completed Working Papers, should be submitted to the Deputy/Assistant Commissioner for approval and guidance, if any. 5.6.5 The audit plan must be discussed with the Deputy Commissioner / Assistant Commissioner of the Circle and should be finalised after approval by the Commissioner/ Additional/ Joint Commissioner/ Deputy/ Assistant Commissioner as the case may be. 5.6.6 The audit group should put up documents received, along with filled in Questionnaire and working papers in the prescribed proforma, related to top five units of each audit circle mentioned in the Annual Plan for audit coverage to the Commissioner and the rest to the Additional / Joint Commissioner through Deputy / Assistant Commissioner in-charge of Circle, for approval of the audit plan, after carrying out preliminary reconciliation, identifying discrepancies, if any, and carrying out detailed examination of the records and information (including that already captured in the Master File of registered person). 5.6.7 In the case of circles where ADC/JC is not stationed at the place of Circle: i. In respect of large and medium units, the audit parties should forward the draft audit plans to the Additional/Joint Commissioner, through the DC/AC of the circle, by e-mail, for approval. The audit of the respective units should not be conducted till receipt of the approval of the ADC/JC, through e-mail. While sending the desk review and the draft audit plan, the information in GSTAM Annexure - I should also be sent. ii. In respect of small units, the Deputy/Assistant Commissioner of the Circle is competent to approve the audit plan. However, the approved audit plan should be forwarded to the Additional/Joint Commissioner, through e-mail, at least 10 days before the conduct of actual audit so as to enable the ADC/JC to communicate additions, if any, before the actual audit takes place.
|