TMI BlogProposal Under Modified Industrial Infrastructure Upgradation SchemeX X X X Extracts X X X X X X X X Extracts X X X X ..... Proposal Under Modified Industrial Infrastructure Upgradation Scheme X X X X Extracts X X X X X X X X Extracts X X X X ..... ch as, State Industrial Development Corporation with minimum mandatory contribution of 25% of the project cost (10% in case of North Eastern Region); 3. Projects are to be sanctioned to upgrade infrastructure in Industrial Estates/Parks/Areas. Greenfield projects could be supported in backward areas, including North Eastern Region (NER); 4. Release of GoI grant (in 3 Installments viz. 30%, 40% a ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... nd 30%) subject to upfront other Stakeholders' contribution; 5. Central grant for physical infrastructure is restricted to 25% of the grant subject to a ceiling of ₹ 12.5 crore. The details of project proposals received and approved under MIIUS along with the funds allocated state-wise/UT-wise is given at Annexure-I. As the projects under MIIUS have been accorded 'in-principle' approval; ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... only funds have been allocated to the projects and so far have not been released or utilized. A list of project proposals received but not approved is given in Annexure-II. Two project proposals under MIIUS were received from the state of Madhya Pradesh and both the proposals have been accorded 'in-principle' approval. However, there are a few proposals received after the cut-off date which are s ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... till under evaluation by Project Management Agency viz. National Productivity Council (NPC). The details of such proposals are given in Annexure-III. The Project Management Agency appointed by this Department has been asked to expedite evaluation. Annexure I The Annexure - I referred to in reply to part (b) of the Lok Sabha Unstarred Question No. 4388 for answer on 8th August 2014 regarding 'Pr ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... oposal under MIIUS' List of project proposals received and accorded 'in-principle' approval S. No. Name of the Project State Allocated Central Grant (Rs. Crore) 1 Industrial Area Zuangtui, Aizawl Mizoram 15.22 2 Bodhjungnagar Industrial Area Tripura 41.90 3 Industrial Growth Centre, Urla, Distt. Raipur Chhattisgarh 12.15 4 Sirgitti Engineering Cluster Chhattisgarh 8.32 5 In ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... dustrial Infra Upgradation of IMT Manesar Haryana 29.27 6 Industrial Infra Upgradation at IMT, Bawal Haryana 29.27 7 Industrial Area, Kandrauri HP 26.97 8 Industrial Area, Pandoga HP 33.46 9 SIDCO, Industrial Growth Centre, Samba J &K 7.45 10 Industrial Estate, Kathua J &K 12.91 11 Devipur Industrial Area Jharkhand 27.36 12 Tupundana Industrial Area, Ranchi Jharkhand ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... 8.11 13 Furniture Hub at Ernakulam Kerala 45.44 14 Kolhar Industrial Area, Bidar Karnataka 48.36 15 Bangalore Aerospace Park, Devenhalli Karnataka 47.43 16 Industrial Area, Sitapur MP 12.75 17 Industrial Area, Ujjaini MP 12.08 18 Angul Aluminium Park Orissa 43.01 19 Punjab Small Industries and Export Corporation Ltd. (PSIEC) Estate, Patiala Punjab 16.58 20 Paddy Proc ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... essing Cluster, Ranga Reddy Telangana 45.29 Annexure II The Annexure - II referred to in reply to part (b) of Lok Sabha Unstarred Question No. 4388 for answer on 8th August 2014 regarding 'proposal under MIIUS' List of project proposals received but not approved Sl. No. Name of the project State 1. Powerloom Cluster at Manpur (Gaya) Bihar 2. Industrial Growth Centre Bhilai, Distt. Dur ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... g. Chhattisgarh 3. Kittur Industrial Area, Bailahongal Taluk, Belgaum Karnataka 4. Maholbhagyath Aliyabad Industrial Area, Bijapur Karnataka 5. Vasantanarasapura Industrial Area, Tumkur Karnataka 6. Bommasandra Industial Area , Anekal Karnataka 7. Kinfra Industrial Park, Ottapalam Kerala 8. Namkum Industrial Area, Ranchi Jharkhand 9. Kokar Industrial Area, Ranchi Jharkhand 1 ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... 0. Tatisilwai Industrial Area, Ranchi Jharkhand 11. Inchalkaranji and Peripheral Indust. Infra. Dev. Cluster Ltd. Distt: Kolhapur Maharashtra Annexure III The Annexure - III referred to in reply to parts (c) & (d) of Lok Sabha Unstarred Question No. 4388 for Answer on 8th August 2014 regarding 'Proposal under MIIUS' List of project proposals which are still under evaluation along with rea ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... sons for pendency Sl. No. Name of the project State Proposed Central Grant (Rs. Crore) Reasons for Pendency 1. Pashamylaran Industrial Area, Medak Telengana 30.51 The State Implementing Agency (SIA) revised their project proposal and the same has been evaluated by PMA; the proposal is under consideration in the Department. 2. Textile park at Addl. Amravati Industrial Area Maharashtr ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... a 33.55 These proposals were received after the cut-off date prescribed by this Department and therefore, could not be considered along with the proposals received on or before the due date. These are being evaluated by PMA for further consideration by the Department. 3. Tarapur Industrial Area Maharashtra 12.50 4. Rajiv Gandhi Info Tech Park Maharashtra 12.50 5. Tamilnadu Chamber Link ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... age Infra Ltd., Madurai (Convention and Centre at Madurai)
Tamil Nadu
44.05
6.
Engineering Industry Cluster ( SIPCOT)
Tamil Nadu
60.00
7.
Chemical park under MIIUS at Howrah
West Bengal
Not mentioned
The information was given by the Minister of State (Independent Charge) in the Ministry of Commerce & Industry Smt. Nirmala Sitharaman in a written reply in Lok Sabha today. X X X X Extracts X X X X X X X X Extracts X X X X ..... s release - PIB ..... X X X X Extracts X X X X X X X X Extracts X X X X
|