Turnkey EPC Contract are not getting covered under supply of ...

GST

September 13, 2018

Turnkey EPC Contract are not getting covered under supply of 'Solar Power Generating System' under Entry 234 of Schedule I of the Notification - The contract for Erection, Procurement and Commissioning of Solar Power Plant falls under the ambit “Works Contract Services” - attracts 18% rate of tax

View Source

 


 

You may also like:

  1. Classification of Supply - supply of solar power generating system - Turnkey EPC Contract - split contract for supply of goods and supply of services may not be valid -...

  2. Rate of tax - supply and setting up of ‘solar power generating system’ - Supply of the said turnkey EPC contract is a ‘composite supply’ u/s.2(30) of the CGST Act, 2017....

  3. Rate of GST - product Solar HT/LT XLPE Cables to be used in the manufacture of Solar Power Generating System/ Solar Power Generator - The product in question viz. Solar...

  4. Input tax credit - inputs / capital goods / input services - Solar Power Generating Plant of the applicant qualify as 'plant and machinery' as it falls under machinery -...

  5. Supply of turnkey Engineering, Procurement & Construction (EPC) Contract for construction of a solar power plant - Nature of supplies made by sub-contractors - the...

  6. Classification of Service - Rate of GST - turnkey Engineering, Procurement and Construction (EPC) Contract for construction of a solar power plant - cannot be held as...

  7. Classification of goods and rates of GST - solar inverter - the combination of solar panel, inverter, solar battery and charge controller may qualify as “Solar Power...

  8. Supply of solar inverter, controller, battery and panels would covered under “Solar Power Generating System” as a whole in terms of serial no. 234 of Schedule-I of the...

  9. Classification - Substation Equipments - part of “Solar Power Generating System” or not - Once the entry includes “Solar Power Project”, all the material equipments used...

  10. Composite supply - natural bundling - The supply of the PV module which is the major component of the Solar Power Plant is not naturally bundled with the supply of the...

  11. Input Tax Credit - solar power panels procured and installed - blocked credit- When Electricity energy manufactured using the Solar Panels were supplied to TANGEDCO...

  12. Classification of supply - GST rate - the activities of supply, design, installation, commissioning and testing of solar energy based water pumping systems, whose time...

  13. Works Contract Service - Turnkey Contract - What matters is the fact that the contracts were executed by the appellants and payments received by them after 01/06/2007...

  14. Input Tax Credit - blocked credit - solar power panels procured and installed - electrical energy generated by Solar Panel installed by the applicant is exempted goods...

  15. Construction service - works contract - Rate of tax on goods supplied under the contract, independent of the Works Contract being executed in the contract. -...

 