Tax Management India. Com
Law and Practice  :  Digital eBook
Research is most exciting & rewarding
  TMI - Tax Management India. Com
Follow us:
  Facebook   Twitter   Linkedin   Telegram

TMI Blog

Home

Khurda Road-Balangir rail project nears completion as another tunnel achieves breakthrough

X X   X X   Extracts   X X   X X

→ Full Text of the Document

X X   X X   Extracts   X X   X X

..... Khurda Road-Balangir rail project nears completion as another tunnel achieves breakthrough
PTI News
Dated:- 14-1-2025
PTI
Bhubaneswar, Jan 14 (PTI) The Khurda Road-Balangir New Rail Line Project achieved a major milestone with the successful breakthrough of the tunnel located between Buguda and Banigochha in Odisha's Nayagarh district, the East Coast Railway said. This 2.6-km-long tu .....

X X   X X   Extracts   X X   X X

→ Full Text of the Document

X X   X X   Extracts   X X   X X

..... nnel, with a 2-degree curve, was completed through the New Austrian Tunneling Method (NATM) of excavation. The breakthrough, or "daylighting", was successfully achieved on Monday, it said. This is the longest tunnel (T-3) in Nayagarh district and the second longest in the entire project, it added. The excavation employed state-of-the-art technologies and machines, designed to navigate the challe .....

X X   X X   Extracts   X X   X X

→ Full Text of the Document

X X   X X   Extracts   X X   X X

..... nging and rugged terrain of the Eastern Ghats. This achievement will play a pivotal role in connecting the eastern and western parts of Odisha, boosting the region’s transportation and economic potential, the statement said. Railway Minister Ashwini Vaishnaw said, "A milestone showcasing engineering excellence in challenging terrains: A breakthrough has been achieved in the 2.6 km-long Tunnel T3 .....

X X   X X   Extracts   X X   X X

→ Full Text of the Document

X X   X X   Extracts   X X   X X

..... (with a 2-degree curve) between Buguda and Baniguchha stations on the Khurda-Bolangir section in Odisha." The 301-km project includes seven tunnels within a 75-km stretch, located between Daspalla and Purunakatak. The construction of these tunnels, particularly through the difficult terrain of the Eastern Ghats, has been one of the most complex aspects of the project. The longest tunnel (T-7) of .....

X X   X X   Extracts   X X   X X

→ Full Text of the Document

X X   X X   Extracts   X X   X X

..... the project spans 4.85 km, and is already complete. A total of 215 km of the rail line has been completed -- 105.8 km between Khurda Road and Daspalla, and 109 km between Balangir and Purunakatak, the statement said. The remaining sections, including the stretch from Purunakatak to Adhenigarh, are progressing and expected to be completed in the coming months, an official said. Once completed, .....

X X   X X   Extracts   X X   X X

→ Full Text of the Document

X X   X X   Extracts   X X   X X

..... this rail line will drastically reduce travel time between Bhubaneswar and Balangir. PTI AAM AAM SOM
News - Press release - PIB .....

X X   X X   Extracts   X X   X X

→ Full Text of the Document

X X   X X   Extracts   X X   X X

 

 

 

 

Quick Updates:Latest Updates